|
|
|
|
|||||||||||||||||||||||
Project Description
This project consisted of the installation of cable tray and heat tracing for 245 piperack modules and 40 process modules. There was 54,000 total footage of cable tray installed, 332,000 total footage of mineral insulated heat tracing installed, and 18,000 total footage of self-regulated heat tracing installed.
|
Contact
For similar projects contact:OwnerSyncrude UE-1 Project
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |