SWQR - Extraction Structural, Mechanical, Piping, E and I

Progress 10-05

Location:

Fort McMurray, AB

Built By:

PCL Industrial Constructors Inc.
Project Description

The Extraction project is part of Syncrude's Southwest Quadrant Replacement (SWQR) expansion project. The project is made up of three separate plants:

Plant 237 – Hydrotransport

The Hydrotransport upgrades include the installation of four new 3,500 hp slurry pump house facilities that deliver oil sands slurry from a new slurry preparation facility in the mine to a new super pot located in the extraction area 240.

Plant 240 – Extraction

The superpot will receive and mix slurry flow from two of the three hydrotransport trains and distribute the mixed slurry equally to the existing primary separation vessels.

Plant 250 – Tailings

The coarse tailings system disposes the tailings from the existing primary separation vessels to the distributor system which will distribute to three separate tailings transport pipe lines.

 