| 1 |
Search Results |
 |
CNRL Horizon Early Works
| Location: |
Fort McKay, AB |
| Description: |
Construction of a concrete structure for a delayed coker unit and a diluent recovery unit |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Dow Chemical Miscellaneous Jobs
| Location: |
Fort Saskatchewan, AB |
| Description: |
Electrical work on various Dow Chemical projects. |
| Built By: |
PCL Intracon Power Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Epcor Caustic Soda Tank Replacement
| Location: |
Edmonton, AB |
| Description: |
Caustic soda tank replacement. |
| Built By: |
PCL Intracon Power Inc. |
|
|
|
|
 |
SWQR - Extraction Structural, Mechanical, Piping, E and I
| Location: |
Fort McMurray, AB |
| Description: |
General mechanical installations for 10 pumphouses at the Aurora Mine site |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Syncrude Plant 18-2/17-2/9-4 LGO Aromatic Saturation Unit
| Location: |
Mildred Lake, AB |
| Description: |
Electrical and instrumentation for an LGO Aromatic Saturation unit. |
| Built By: |
PCL Intracon Power Inc. |
|
|
|
|
 |
Syncrude UE-1 Piperack Modules Mgmt
| Location: |
Nisku, AB |
| Description: |
Module fabrication for the UE-1 project. |
| Built By: |
PCL Intracon Power Management Inc. |
| Delivery Method: |
[DB] Design-Build |
|
|
 |
UE-1 Completions Work
| Location: |
Fort McMurray, AB |
| Description: |
Punch-out, commissioning and start-up work for entire UE-1 project |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
| |
| 1 |