| 1 |
Search Results |
 |
CNRL Horizon Early Works
Location: |
Fort McKay, AB |
Description: |
Construction of a concrete structure for a delayed coker unit and a diluent recovery unit |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Dow Chemical Miscellaneous Jobs
Location: |
Fort Saskatchewan, AB |
Description: |
Electrical work on various Dow Chemical projects. |
Built By: |
PCL Intracon Power Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Epcor Caustic Soda Tank Replacement
Location: |
Edmonton, AB |
Description: |
Caustic soda tank replacement. |
Built By: |
PCL Intracon Power Inc. |
|
|
|
|
 |
SWQR - Extraction Structural, Mechanical, Piping, E and I
Location: |
Fort McMurray, AB |
Description: |
General mechanical installations for 10 pumphouses at the Aurora Mine site |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Syncrude Plant 18-2/17-2/9-4 LGO Aromatic Saturation Unit
Location: |
Mildred Lake, AB |
Description: |
Electrical and instrumentation for an LGO Aromatic Saturation unit. |
Built By: |
PCL Intracon Power Inc. |
|
|
|
|
 |
Syncrude UE-1 Piperack Modules Mgmt
Location: |
Nisku, AB |
Description: |
Module fabrication for the UE-1 project. |
Built By: |
PCL Intracon Power Management Inc. |
Delivery Method: |
Design-Build [DB] |
|
|
 |
UE-1 Completions Work
Location: |
Fort McMurray, AB |
Description: |
Punch-out, commissioning and start-up work for entire UE-1 project |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
| |
| 1 |